CERN Accelerating science

All CERN Accelerators documents

Ultimi arrivi:
2026-04-30
08:43
RF Basics I & II / Gerigk, Frank (CERN)
This lecture starts with a brief historical introduction and an explanation how to get from Maxwell's Equations to a simple cavity. [...]
arXiv:2602.23215.
- 2026 - 53.
Fulltext

Record dettagliato
2026-04-30
08:43
Transverse Wakes Obtained through Measurements and with the TBCI Computer Code; A Comparison using a LEP Cavity as an Example / Thordahl, Lars (CERN) ; Caspers, Friedhelm (CERN)

Record dettagliato
2026-04-30
08:43
III.14 - CERN beamline for fixed-target experiments / Gerbershagen, Alexander (U. Groningen (main))
Fixed-target experiments are continuing to play a major role in the very beginnings of accelerator-based studies in particle physics. While collider experiments dominate the exploration in the high-energy domain, fixed-target experiments still cover the important complementary domain, as they permit experiments with extremely high event rates. [...]
2024 - 11 p. - Published in : CERN Yellow Rep. School Proc. 3 (2024) 2155 Fulltext: PDF;
In : Proceedings of the Joint Universities Accelerator School (JUAS): courses and exercises, Geneva, Switzerland, 27 Nov 2024, pp.2155 (CERN-2024-003)

Record dettagliato
2026-04-28
06:21
Low Cost Trimming Converter for Two-Stage Three-Terminals Multibeam Klystron / Yadav, Vinod Kumar (Aalto U.) ; Moratalla, Manuel Colmenero (CERN) ; Chub, Andrii (Aalto U.) ; Aguglia, Davide (CERN) ; Raidal, Martti (NICPB, Tallinn)
This paper presents an innovative solution to power the two-stage multibeam klystron (TSMBK) for the future circular collider (FCC). [...]
2025 - 8.

Record dettagliato
2026-04-28
06:21
The future circular collider in Europe / Zimmermann, Frank (CERN) ; Benedikt, Michael (CERN)
The proposed Future Circular Collider (FCC) integrated programme consists of two stages: An electron–positron collider serving as a highest-luminosity Higgs-boson, electroweak and top-quark factory, followed by a proton–proton collider with a collision energy around 100 TeV. In 2021, the CERN Council initiated the FCC Feasibility Study. [...]
2026 - 7 p. - Published in : JACoW NAPAC 2025 (2026) 7-13 Fulltext: PDF;
In : 5th North American Particle Accelerator Conference (NAPAC2025), Sacremento, CA, United States, 10 - 15 Aug 2025, pp.7-13

Record dettagliato
2026-04-28
06:21
Basics of RF Electronics / Dexter, Amos Christopher (Lancaster U. (main))
The focus of this educational text is selected examples of high-frequency electronic circuits and their components employed for the accurate phasing and synchronisation of accelerator cavities. [...]
arXiv:2602.15205.
- 2026 - 38.
Fulltext

Record dettagliato
2026-04-24
15:11
Short Summaries of the ATS Seminars in 2025 / Metral, Elias (CERN) ; Dallocchio, Alessandro (CERN) ; Stora, Thierry (CERN) ; Sublet, Alban (CERN)
Thirteen ATS seminars took place in 2025 (https://indico.cern.ch/category/2725/). [...]
CERN-ACC-NOTE-2026-0006.
- 2026
Full text

Record dettagliato
2026-04-24
11:25
Correctability of Measured Quadrupole Errors in the New Separation Dipoles on the HL-LHC Optics with a Local Skew Quadrupole Corrector / Dilly, Joschua Werner ; Maclean, Ewen Hamish (CERN) ; Tomas Garcia, Rogelio (CERN)
In this study the correctability of the skew quadrupole field errors, as measured in one of the fabricated separation dipoles for the low-beta* insertion regions of the HL-LHC, by means of a locally installed skew quadrupole magnet is evaluated. [...]
CERN-ACC-NOTE-2026-0005.
- 2026
Full text

Record dettagliato
2026-04-23
07:25
Towards Autonomous Execution of Safe and Precise Robotic Radiation Surveys in the Super Proton Synchrotron / Forkel, David (CERN ; Jaume I U., Castellon) ; Cervera, Enric (CERN ; Jaume I U., Castellon) ; Marín, Raúl (CERN ; Jaume I U., Castellon) ; Habibiroudkenar, Pejman (CERN ; Aalto U.) ; Matheson, Eloise (CERN)
Abstract The article presents the automation of radiation surveys in the Super Proton Synchrotron (SPS) accelerator using autonomous robotic navigation techniques. The mission plan includes precise radiation monitoring along beam components; navigation along walls; crossing safety doors; maneuvering in open spaces (e.g., entrances and the beam dump area); deploying a manipulator-mounted radiation sensor; and docking or undocking at charging stations for long-term operations. [...]
2025 - 27 p. - Published in : J. Intellig. Robot. Sys. 112 (2025) 9 Fulltext: PDF;

Record dettagliato
2026-04-22
06:16
Charge response and energy calibration of ProtoDUNE-SP / Chambers-Wall, Graham (William Jewell Coll.)
ProtoDUNE-SP at the CERN Neutrino Platform is a test bed liquid argon time pro- jection chamber (LArTPC) for the far-detector in the Deep Underground Neutrino Ex- periment (DUNE). [...]
FERMILAB-PUB-20-411-ND.
- 2020 - 10.
Fermilab Library Server - Fulltext

Record dettagliato