CV equipment responsibilities / Pirollet, B
This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. [...]
CERN-TS-Note-2008-044 ; EDMS950035.
- 2008. - 3 p.

Registre complet - Registres semblants
2008-08-14
16:09
Flammable gas and oxygen deficiency hazard detection in the LHC / Bonthond, F
This document describes the Flammable Gas detection and Oxygen Deficiency Hazard alarm systems that have been installed in the LHC Machine..
CERN-TS-Note-2008-043.
- 2008. - 14 p.
Access to fulltext

Registre complet - Registres semblants
2008-08-11
15:52
Automatic fire detection systems installed in the LHC machine / Bonthond, F
This document describes the Automatic Fire Detection (AFD) alarm systems that have been installed in the LHC Machine..
CERN-TS-Note-2008-042 ; EDMS945727.
- 2008. - 16 p.
Access to fulltext

Registre complet - Registres semblants
2008-08-11
15:49
Automatic emergency evacuation systems installed in the LHC underground areas (machine and experiments) / Bonthond, F
This document describes the Audible Emergency Evacuation alarm systems that have been installed in the LHC underground Machine and Experimental areas..
CERN-TS-Note-2008-041 ; EDMS945726.
- 2008. - 17 p.
Access to fulltext

Registre complet - Registres semblants
2008-08-08
11:32
Experience with the infrastructure systems during the commissioning of the LHC / Saban, R (CERN)
The commissioning activity which started in October 2005 consists in the short circuit tests, the commissioning of the non cryogenic systems and the finally the powering tests of the superconducting components of the LHC. During all theses phases, the infrastructure systems are brought into operation, their performance assessed and validated for the routine operation of the collider. [...]
CERN-TS-Note-2008-040; EDMS936665.- Geneva : CERN, 2008 - 8 p. External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.233-240

Registre complet - Registres semblants
2008-08-08
11:30
Coordination of the installation and of the commissioning of the machine [LHC] / Foraz, K (CERN)
The installation of the LHC machine is now finished, and the powering tests are on-going. Since the start of the civil engineering works in 1998, a lot of installation works and tests had been performed by different groups and departments, by different type and size of contracts, and with different technologies. [...]
CERN-TS-Note-2008-039; EDMS936664.- Geneva : CERN, 2008 - 7 p. External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.227-232

Registre complet - Registres semblants
2008-08-08
11:29
TS deliverables for the LHC / Pettersson, Thomas Sven
This document gives a brief overview of the LHC deliverables for which the TS department has the sole or a major responsibility. [...]
CERN-TS-Note-2008-038 ; EDMS936663.
- 2008. - 11 p.
Access to fulltext

Registre complet - Registres semblants
2008-08-08
11:08
Interventions mécaniques d'urgence pour le LHC / Folch, R (CERN) ; Atieh, S (CERN) /MME
Si la plupart des équipements du LHC ont pu être installés dans des conditions maîtrisables, certains objets ont nécessité une forte mobilisation du département TS afin de surmonter les difficultés rencontrées par les responsables de ces équipements et parvenir à respecter le planning. Cette présentation propose de revenir sur ces situations de crise atypiques pour mieux en comprendre les enjeux, les leçons et les formules gagnantes à retenir. [...]
CERN-TS-Note-2008-037; EDMS936660.- Geneva : CERN, 2008 - 7 p. External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.211-226

Registre complet - Registres semblants
2008-08-08
11:05
Alignment of the low-$\beta$ magnets and the experiments in the LHC / Herty, A (CERN) ; Mergelkuhl, D (CERN)
For the LHC project the demands on alignment and positioning have been increased with respect to previous projects; this concerns the experiments as well as the accelerator. Alignment and continuous monitoring of the low-beta magnets in combination with new methods have become necessary. [...]
CERN-TS-Note-2008-036; EDMS936560.- Geneva : CERN, 2008 - 8 p. External link: Access to fulltext
In : 3rd TS Workshop, Archamps, France, 27 - 29 May 2008, pp.203-210

Registre complet - Registres semblants
2008-08-08
11:02
Quality procedures for electronics production / Magnin, B
Qu'elles soient réalisées en pièces uniques ou en petites séries, les cartes électroniques dessinées et produites par DEM devront garantir le fonctionnement de la machine et des expériences pendant une vingtaine d'années, tout en étant difficilement accessibles en cas de défaillance. [...]
CERN-TS-Note-2008-035.
- 2008. - 0 p.

Registre complet - Registres semblants