2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-21 04:58 |
詳細記錄 - 相似記錄
|
2008-11-20 05:01 |
Consolidation on civil engineering and technical infrastructure
/ Alves, P (CERN) ; Nonis, M (CERN) ; Pepinster, P (CERN) ; van Baaren, W (CERN)
The use and age of the civil engineering structure (office buildings, halls, tunnels) and of tertiary technical equipment (mainly HVAC and electricity) at CERN is such that their renovation must be considered in the near future. Due to the large number of buildings and equipment in these conditions, and the restricted budget available it is extremely important to define priorities. [...]
ST-Note-2003-044.-
2003
Fulltext: PDF;
In : 6th ST Workshop, Thoiry, France, 1 - 3 Apr 2003, pp.e-page 044
|
詳細記錄 - 相似記錄
|
2008-11-20 05:01 |
ST-HM design section : Strategy and working methods
/ Bertone, C (CERN)
The design section of the ST-HM group is devoted to realise all studies for new transport and handling equipment to be procured and installed according to the needs of CERN. In year 2002, the design section has gradually passed from strong engagement in few huge projects to a multitude of ‘less expensive’ projects that require a fast solution and procurement for the LHC installation. [...]
ST-Note-2003-043.-
2003
Fulltext: PDF;
In : 6th ST Workshop, Thoiry, France, 1 - 3 Apr 2003, pp.e-page 043
|
詳細記錄 - 相似記錄
|
2008-11-20 05:01 |
詳細記錄 - 相似記錄
|
|
|