2015-10-20 15:33 |
Подробная запись - Подобные записи
|
2013-04-18 09:16 |
Подробная запись - Подобные записи
|
2011-02-21 09:24 |
How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites
/ Czarapata, P C (FNAL) ; Hartill, D L (Cornell) ; Myers, S (CERN) ; Peggs, S (Brookhaven) ; Phinney, N (SLAC) ; Serio, M (INFN) ; Toge, N (KEK, Tsukuba) ; Willeke, F (DESY) ; Zhang, C (IHEP, Beijing)
A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. [...]
cs/0110029.-
2001 - 5 p.
External link: Preprint
In : 8th International Conference on Accelerator and Large Experimental Physics Control Systems, San José, CA, USA, 27 - 30 Nov 2001, pp.e-proc.FRBI001
|
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
2008-11-06 05:13 |
Подробная запись - Подобные записи
|
|
|